IMPROVE RELIABILITY CALCULATION OF WIND AND NETWORK SOLUTIONS ASSURANCE COAL MINE VENTILATION FILLING OPENING

https://tapchi.humg.edu.vn/en/archives?article=221
  • Affiliations:

    1 Trường Đại học Mỏ - Địa Chất

  • Received: 10th-Mar-2014
  • Revised: 13th-Apr-2014
  • Accepted: 30th-Apr-2014
  • Online: 30th-Apr-2014
Views: 1860
Downloads: 423
Rating: 1.0, Total rating: 42
Yours rating

Abstract:

The extent to ensure ventilation for underground mines depends on the design, as well as network computing wind ventilation equipment. I Khe Cham Coal Mine, is in Phase III investment activities under the project to expand production. In the coming years, network change and wind fields will become more complicated due to 4 stations use fans to ventilate the mine. This paper proposes the application of specialized software to improve reliability while enhancing network computing wind fields. Calculation results allow making recommendations on the use of fan-No.30 2K56 engine with 400kW ventilation to reduce costs in the early stages of production and expanded. 1250kW engine capacity will be needed in the future to use the enhanced mine catches as planned.

How to Cite
Tran, H.Xuan, Dang, C.Vu and Dao, C.Van 2014. IMPROVE RELIABILITY CALCULATION OF WIND AND NETWORK SOLUTIONS ASSURANCE COAL MINE VENTILATION FILLING OPENING (in Vietnamese). Journal of Mining and Earth Sciences. 46 (Apr, 2014).

Other articles