Research to select integrated equipment follow to new technology belong to well control system in design the 90m water depth jack-up rig

https://tapchi.humg.edu.vn/en/archives?article=80
  • Affiliations:

    1 Công ty CP Chế tạo giàn khoan Dầu khí-PVShipyard;
    2 Trường Đại học Mỏ - Địa chất;
    3 Công ty PVD - Well Services

  • Received: 24th-Dec-2011
  • Revised: 20th-Jan-2012
  • Accepted: 30th-Jan-2012
  • Online: 30th-Jan-2012
Views: 1858
Downloads: 460
Rating: 1.0, Total rating: 45
Yours rating

Abstract:

Currently, the first time in Vietnam, the 90m water depth jack-up rig project, the team of engineers and foreign experts, research and development of detailed design, fabrication and assembly. On the basis of the technical requirements of investors, research and development from the basic design drawings. Calculation, research, development to detailed design and selection integrated equipment follow to new technology belong to well control system with the new technology in the world