×
Search for articles
Search
Phrases separated by commas "," with the condition OR
Phrases separated by "&" with the condition AND
Phrases separated by "&" with the condition AND
Articles with citations
Keywords
Title
Abstract
By Author
Results Sort
Sort by
Number of rows
Results: 13 articles
Search Text: "Bùi Mạnh Tùng"
Mining Engineering
[Vol 62, Issue 5a, 12 - 2021]
Stress distribution ahead of mechanized longwall top coal caving face with great cutting height
- 3588
[Vol 62, Issue 5a, 12 - 2021]
Improvement of production arrangement chart for mechanised longwall at Seam 11 of Centre area - Duong Huy coal mine
- 3541
[Vol 62, Issue 5a, 12 - 2021]
Orientation underground exploitation method to develop for the Lang Vai of small scale antimol region, Tuyen Quang Province
- 3537
[Vol 59, Issue 6, 12 - 2018, Full papers]
A modelling technique for top coal fall ahead of face support in mechanised longwall using Discrete Element Method
- 3299
[Vol 61, Issue 1, 02 - 2020]
Complete methodology to resist in mechanism longwall mine 6# at Nam Mau Coal Company
- 3003
[Vol 61, Issue 4, 08 - 2020]
Assessment of the effective working time on the mining output of the mechanized longwall (coal seam 11) in Ha Lam coal mine
- 2905
[Vol 55, 08 - 2016]
Research on distribution laws of plastic strain in cutting - caving ratio in mechanized longwall and thick-seam mining
- 2278
[Vol 58, Issue 1, 02 - 2017]
Research on replacement process of stone shield for damaged GK frame support
- 2240
[Vol 60, Issue 5, 10 - 2019]
Setup knotting model to determine influencing factors and effective working time in the organizational structure of mechanized longwall production
- Dung Van Nguyen, Dung Tien Thai Vu, Chi Van Dao, Tung Manh Bui, Hung Phi Nguyen *, Quang Tien Vu, Nhan Thanh Thi Dinh
- 2146